Silver Lake Water Quality Improvement Project
This project will stabilize a ravine and capture runoff to reduce future erosion along Silver Lake.
Overview
In 2017, the Use Attainability Assessment (UAA) for Silver Lake was updated and identified Silver Lake Subwatershed SiL-2 as a target subwatershed. This project will stabilize an existing ravine, place iron enhanced sand filter ditch checks in the stabilized ravine, capture the runoff from Pleasantview Road in a structure designed to dissipate the energy and reduce any future erosion.
Work began on September 6th and was subtantially complete on November 19, 2021.
Resources
Silver Lake WQ Feasibility Report
Silver Lake WQ Project Plan
Summary
Status: Substantially complete
Start: September 2021
End: November 2021