Middle Riley Creek Stabilization Project

Summary

Status: Substantially completion, with ongoing maintenance.
Start: September 2021
End: October 2021

Overview

This project will stabilize 970 feet of Riley Creek within the Bearpath Golf and Country Club.

The Middle Riley Creek Stabilization Project will stabilize 970 feet of Riley Creek at two separate locations within the Bearpath Golf and Country Club. This private/public partnership will provide water quality benefits as well as climate resiliency. This is done through increased flood storage as the realigned channel will be reconnected to the floodplain through grade control features such as rock riffles, cross vanes, and J-hook vanes. These features, as well as the native buffers to be established, will provide riparian habitat.

Project Phase

Flowchart of project steps: Regional Analysis, Feasibility Study, Design, Bidding, Construction, Substantial Completion, Final Completion.

Project Area